MANOR ISD FACILITY ASSESSMENTS

Owner | Manor ISD

Location | Manor, Texas

In preparation for an upcoming bond election, BLGY was a leading member of a team employed by Manor ISD to undertake a facilities assessment of the buildings that we had designed for the district. Under consideration in our evaluation were the following items that the district could include as part of remodel/addition work, should the subject facility become a part of meeting long range goals:

  1. Feasibility for future expansion
  2. Design remediation allowing existing facilities to serve a greater student population
  3. Current instructional needs
  4. Safety, security and accessibility
  5. Conditions of existing thermal/moisture envelope
  6. Identify and budget for needed facility repairs and system upgrades

For each facility, our team analyzed the existing documentation, and performed detailed on-site investigations. Staff surveys regarding contemporary educational appropriateness were an invaluable part of the process. Our resultant recommendations to the District were to help in their evaluation of long-term facility needs, and with prioritizing for future budget allocations.

 

  • Skills: ,
  • Author Name: Derek Andorson
  • Author URI: http://example.com
  • Release Date: January 6, 2017
BLGY-Designed Manor High School Addition